Thursday, December 24, 2009
Thursday, December 17, 2009
Wax Face Before Or After Shower
Now that we have done in the near future to be not so much and we really enjoy, other people for to inspire the theme of robotics we have finalized our own competition to make: go
the
This is also about getting the Paderborn schools together!
And here's the official description:
PadeRobots The Cup is the first LEGO robot competition for Paderborn schools. It is designed to stimulate interest in LEGO Mindstorms and the communication between the computer science students and enthusiastic teachers in Paderborn. The competition is organized this time by the Pelestorms and Pelizaeus-Gymnasium , but should be done in future in turn by other schools.
For whom?
Anyone who already has some experience with building and programming NXT robots and between 10-16 years old, may have to sign over his school. There are 42 cars, of which 3 per registered school. The remaining places will be allocated according to need and order of registration.
When?
The competition takes place on 29 and instead of 01/30/2010. On Friday, 29.01. (Date of report cards) the building and programming phase begins at 12:00 clock and goes to 22:00 clock. Am 30.01. it goes on at 9:30 clock and it may again be tinkered clock to 13:00. This is followed by about 18:00 clock, the actual competition.
How?
The teams, each consisting of 3 students will be drawn at the start of the competition on Friday. Then the 3 competition tasks will be announced. Then the teams get their material and are now working meticulously on solutions to the tasks. For support and questions jurors are on the spot. Saturday will begin after lunch, the actual competition. Per task you have to get 3 attempts at the maximum 100 points. In the subsequent award, the highest scores in each of the individual tasks and prizes awarded an overall winner.
What needs to be brought back?
- good mood!
- welcome Pro started 3 students per school, a complete school NXT set (this should not be possible in exceptional cases, please contact us regarding ). These are issued to the team dissolved and after the competition, of course, returned.
- Also covered for each participant 5 € entry fee for meals, etc. to.
How can I / my students log in?
Simply register below application plus download the registration form and fill out for each participant.
Sunday, December 13, 2009
Brown Smelly Discharge With Urination
Yesterday, Saturday was at our school once again the "open door".
course we were well represented as a robot-AG.
The Pelestorms introduced themselves and answered questions about robotics in our school.
In the next room were the interested parties themselves eagerly in programming and would not actually leave.
A small consolation: We offer our school is already starting at the fifth grade, a junior AG.
so we could inspire us with daily programming, the younger students.
The open day was therefore of our site a success!
Wednesday, November 4, 2009
How Many Rows On The Floor At Rose Quarter
Team weekend is now over and it can be said it was a complete success.
It was a weekend full of fun ....
and focused work
But of course, came the team situation is not too short and it became the head-free get done in between sports.
time for a full team photo was still on course!
We practiced every kind of presentation .... (Here team presentation )
... and the Juniors had to prove themselves and present their work results parents.
Finally, we presented our preliminary before lecture and introduced ourselves to the criticism of many parents.
It has just been super fun and we now hope that there will be many of this kind.
Saturday, October 31, 2009
Guys Small Meduim Or Large Nipples
early today was off again:
no later than 8:30 were all awake and also the slightly sleepy Jonas was still thrown out of bed.
Immediately after the meal together, Mr. Domen came to work with our juniors, because they too have to practice so diligently for next year maybe it himself to be.
a super line follower they have already done:
Pelestorms We, however, have long practiced for our team presentation ....
... but also the robot presentation was busy practicing and now it is food for now.
Friday, October 30, 2009
Holland Motor Lodge Receptionist
Today has now started our second team weekend as final preparation for the competition.
Even right after school it started: It had to be packed.
And so were the field, building, robot base, robot, Lego boxes, the mascot, the robots of the juniors, some notebooks and much more in the van of Julius loaded.
And just Soren was treated very carefully by Dorte.
Arriving first was all set up and loose-immediately.
Our juniors, some just come back from the class trip, went immediately to work and what it takes tinkered
holds numerous runs several research and presentation exercises later we were all exhausted, and then looked at last even a movie.
Now we are all but safe custody and (at least as far as I can hear it here now) still in bed and look forward to tomorrow - it goes out early!
Tuesday, October 27, 2009
Starving After Stoming Flu
Monday, October 19, 2009
How To Grow Faster My Nails
And after a month dry spell, we'll get well again.
Much has done and what it is the first report, our new T-Shirts .
This year our T-Shirts orange and next to our logo (which is still the same) this year we have a very specific team logo, which has us for a importance :
" together in motion" is our slogan this year and this means to us much more than simply to play only on movement and transport .
Our team consists of people aged 12 - 17 years and we are working together on a project and try to make a difference in our world - hold together in motion.
addition, it is present now at the time of the latest addition to our team:
The team's mascot, is this what we have at the radio-high-pen games even won a prize in the name Sören Smörrebröd been baptized and now finally the team mascot Pelestorms .
was recently now the 150 year anniversary of our school, the school Pelizaeus Paderborn.
where we used the one the day to continue working on our project, therefore, to program and practice, with auch der Spielfeld Aufbau sehr viel trainiert wurde.
Gleichezeitig bot sich uns aber auch die Gelegenheit unser Projekt ehemaligen und aktuellen Schülern des Pelizaeus vorzustellen und so wurde sowohl mit alt, als auch mit jung geredet, diskutiert und gelacht.
Insgesamt war dieser Tag ein voller Erfolg für uns und auch hoffentlich alle anderen, die wir mit unserem Projekt unterhalten konnten.
Saturday, September 12, 2009
How To Hit A Wedge Further
Es ist zwar Wochenende, aber selbst da machen wir Pelestorms nicht schlapp (zumindest einige), und so fuhren heute Jan, Julius und Jonas nach Horn to agent Mr Mowschek.
There we were warmly greeted and had to first of all and find myself working with a catalog of places in Germany.
followed a guide on the details of which we post here of course not!
However, it was said so much that we practically everything that has to do with a forwarding itself could learn.
then gave it to us then another Hinternisparcour, in which initially had a bucket to transport water over a huge stack of pallets, and Jonas won clearly.
The second part was to drive around with a fork lift pylons, and Julius was all behind him, and Jonas took the drive around literally.
was last much photographed and Grandpa Mowscheck we fulfilled a wish for him and photographed his truck.
It was a very interesting and successful day! Thanks Mowschek
family!
Thursday, September 10, 2009
What Are The White Bumps Inside Your Nose
have from September 5 to September 6, we spent the weekend in a team Pelestorms Neuenheerse.
On Saturday at 10:00 clock we met on site and only once have made a small meeting. We are the tasks and rules of the Robot Game, and went through the research contract. Then it was time for work - how exactly is this place, of course not tell ;-)
At 13:00 clock it was for the hungry mouths at last lunch, which made Spaghetti Bolognese, salad, cake and ice was. After the table had a small service has eliminated again, went to work. It has tinkered at the Robot Game, and searched for the research presentation for information.
it was about 15:30 clock coffee and cake, so we got enough energy. According to another construction phase we were able to educate first good success, as a task already works the way we have imagined. Now, the other tasks on the series, which we did not fall quite so easily.
Suitable for grilling Chris came to us on the way to Copenhagen to be related in their native language to English trip. Together, with even more guests, we had a lot of fun.
After the barbecue was still tweaking something, but it was clear that the air was out for today and all looked a bit tired. Nevertheless, we sat together to 12:00 clock and did a lot of nonsense. At 1:00 clock was then concluded and an hour later, sleep half on.
clock rang at 8:00 in time for most of the clock, clock at 9:00 because breakfast was announced. After fiddling breakfast and one hour, we went into the Turnhalle.Dort were the top team a few games on the program, the weld us together should continue. Then we could then really thorough work-with a game of volleyball or football.
tinkered with fresh ideas, we continue to the robot, for which we have not yet found a name. In between we made a little photo shoot, with great team photos. After the final sprint came our personal coach Ramon. With him we had a team meeting and the new team members have learned that you can not Angst haben soll und die Situationen so nehmen muss, wie sie ist. Wenn wir jetzt nicht Mental und Robotertechnisch auf dem Wettbewerb eingestellt sind, dann weiß ich es auch nicht ;-)
Gegen 18:00Uhr war aufräumen angesagt und so ging das Teamwochenende leider viel zu schnell vorüber.
Fazit: Wir haben schon einen großen Schritt im Robotgame gemacht und fahren die 120 Punkte sehr sicher nach Hause, wobei das jedes Team machen wird, auch wenn man den Roboter nicht starten lässt ;-)
Ein Dank auch an unsere Betreuer, die das ganze erst möglich gemacht haben!
Allen anderen Teams wünschen wir eine gute Vorbereitung.