summer cleaning
started today for us all to school again, but that, fortunately, the AG-controlled daily (at least a ray of hope on the horizon).
had First out of the waste: The construction drawings of the last pitch has been stored, the remains of our Masskottchen tinker action were swept up and then the styrofoam parts with which the robot had been packed on the way to Copenhagen, stuffed into the garbage bin .
was then still swept the floor and rearranged a bit, so we have an optimal working comfort ...
0 comments:
Post a Comment